-
Audi Commences Production of A2 e-tron At Ingolstadt Plant
September 11, 2026
Interestingly, the company claims that the development timeline for the A2 e-tron was reduced by 21 months compared to previous vehicle projects through streamlined pre-series evaluation and coordination processes. The EV manufacturing process incorporate
MT Bureau
-
LICO Partners Epsilon Advanced Materials For Battery-Grade Graphite Recovery
September 10, 2026
At present, China controls over 90 percent of global graphite refining and anode material production, with International Energy Agency projections indicating China will supply 80 percent of battery-grade graphite through 2035. India's Ministry of Heavy In
MT Bureau
-
Ultraviolette To Build 250,000 Units Per Annum Capacity BIGGA Factory In Hosur
September 10, 2026
The site will complement Ultraviolette's existing plant in Bengaluru, Karnataka. The project is expected to generate approximately 2,000 jobs during its first phase.
MT Bureau
-
Vedanta Invests Over INR 210 Billion To Build India’s EV Metals Ecosystem
September 09, 2026
At present, India imports over 80 percent of its critical mineral requirements. To establish domestic resource access, Vedanta said it has secured 10 critical mineral blocks covering copper, nickel-chromium-platinum group elements, tungsten, graphite, van
MT Bureau
-
Recyclekaro Partners Uzbekistan’s TMK To Build Critical Mineral Recovery Ecosystem
September 09, 2026
Under the agreement, Recyclekaro and TMK will form a joint venture to build a greenfield facility in Uzbekistan focused on end-of-life battery recycling and critical mineral extraction.
MT Bureau
-
Gestamp Inaugurates INR 5.23 Billion Plant In Gujarat, Marks 5th Facility In India
September 08, 2026
The new plant employs 240 people and houses two hot-stamping lines, a laser cutting line and welding cells for assembly operations. It produces body-in-white (BiW) components, including parts from the Ges-Gigastamping product line, which integrate large s
MT Bureau
